ITB 2023-34-211025_ARRC Bird Creek Bridge 86.6 Replacement

Addendum #4 7/13/23-changes due date
Addendum #3 7/11/23
Addendum #2 7/7/23
Addendum #1 6/23/23 - changes the due date
Contractor shall replace the bridge at Bird Creek 86.6.
Work includes, but is not limited to; the removal and disposal of the existing 125-foot steel pony truss superstructure and timber approach trestles that cross Bird Creek at ARRC MP 86.6, fabrication of new substructure components to convert the existing concrete piers to abutments, installation of a new 125-foot steel thru plate girder superstructure, removal of existing and installation of new riprap armoring for erosion prevention, relocation of existing underground utilities (by utility owner), construction and removal of temporary access and structures, and track construction required to accommodate the raised elevation of the new structure crossing Bird Creek.

Pre-Bid Conference
: A pre-bid conference will be held on June 23, 2023 at 11:00 AM

Site Visit:
  A non-mandatory site visit will be held on June 22, 2023, at 11:00 am.

BIDS WILL BE RECEIVED UNTIL 3:00 PM LOCAL TIME ON Friday, July 21, 2023