Addendum #1 issued 8/15/23
ARRC is seeking an engineering firm to provide design services for a series of right of way stabilization projects in the Healy Canyon, which lies between Denali Park (ARRC Milepost 348 – and Healy Access Road (ARRC MP 361). Railroad Track follow the Nenana River along the canyon corridor.
Proposals will be received until 3:00 PM LOCAL TIME on August 22, 2023.
A pre-bid conference will be held on August 10, 2023 at 11:00 AM local time.