FAST ADA Improvements: Fairbanks 10th Avenue
State Project Number: NFHWY00965
The Alaska Department of Transportation and Public Facilities (DOT&PF) is requesting public comments on the proposed FAST ADA Improvements: Fairbanks 10th Avenue project. The proposed project will repair and upgrade existing sidewalks along both sides of 10th Avenue, from Kellum Street through Lathrop Street, in order to bring the sidewalks into compliance with the Americans with Disabilities Act (ADA) (Figure 1).
Actions proposed under NFHWY00965 include:
- Replace/move the existing curb and gutter.
- South side will have the sidewalk widened to 6 feet toward the roadway by removing the thin vegetative strip between the existing back of curb and sidewalk, curb and gutter will follow existing alignment with minor adjustments. Location of the back of sidewalk will remain as it is now - near right-of-way (ROW) boundary.
- North side - move curb and gutter toward the roadway by 2-3 feet, widen the sidewalks to 6 feet, and have a buffer space between the sidewalk and the back of curb (most of the existing light poles will be in this buffer space). Location of the back of sidewalk will remain as it is now - near ROW boundary.
- Repave the roadway width needed to construct the improvements (potentially saw cut several feet within the curb and gutter).
- Replace curb ramps.
- Sidewalk cross slope, especially at driveways, will be flattened to meet ADA requirements. The driveways and walkways may need to be adjusted to meet the new sidewalks.
- Trim vegetation to the ROW line.
- Replace curb drain inlet catch basins, excavation depths up to 6-7 feet below ground surface.
- General excavation depth is approximately 2 feet except for storm drain work up to 7 feet deep.
- Striping (add crosswalk striping and other as needed).
- All work is to be completed within the existing ROW, although Temporary Construction Easements and/or Temporary Construction Permits will be required in order to complete the work.
- Existing utilities to remain in place (including utility/light poles).
- Earthen material required to construct this project will be contractor furnished.
Please provide comments on this project or request additional information by December 24, 2026, to:
Ivet Hall, P.E., Engineering Manager
Alaska Department of Transportation & Public Facilities
2301 Peger Road, Fairbanks, AK 99709
Phone: (907) 451-5386 or by e-mail at: ivet.hall@alaska.gov
Text Telephone (TDD): 771 or 1-800-770-8973
The project is being developed in accordance with the following Executive Orders (EO): EO 11988 (Floodplain Management); EO 11593 (Protection and Enhancement of the Cultural Environment) and EO 13112 (Invasive Species).
The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by the DOT&PF pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated April 13, 2023, and executed by the Federal Highway Administration and DOT&PF.
It is the policy of the Alaska Department of Transportation and Public Facilities (DOT&PF) that no one shall be subject to discrimination on the basis of race, color, national origin, sex, age, or disability, regardless of the funding source, including Federal Transit Administration, Federal Aviation Administration, Federal Highway Administration, Federal Motor Carrier Safety Administration and State of Alaska funds. Title VI Nondiscrimination Policy: https://dot.alaska.gov/tvi_statement.shtml. To file a complaint: dot.alaska.gov/cvlrts/titlevi.shtml