View

Notice

Share

Notice to Begin Engineering and Environmental Studies/Request for Public Comments -Manley Hot Springs SLough Bridge #0272 Replacement

State of Alaska Department of Transportation and Public Facilities (DOT&PF)
Notice to Begin Engineering and Environmental Studies/Request for Public Comments

Manley Hot Springs Slough Bridge #0272 Replacement
State Project Number NRMBS00833

The Manley Village Council (MVC) in cooperation with the State of Alaska Department of Transportation and Public Facilities (DOT&PF) proposes to replace the Manley Hot Springs Slough Bridge #0272 located in Manley Hot Springs, Alaska. MVC sponsored and secured Federal Tribal Transportation Bridge Program Funds to replace the existing Manley Hot Springs Slough Bridge.

The project proposes replacing the existing bridge. The new bridge will be a 2-span concrete decked steel girder bridge with one pier located in the middle of the slough. The bridge will have two 12-foot vehicle lanes, 2-foot shoulders, and an 8-foot-wide dedicated pedestrian path. The new bridge will be constructed along the existing road alignment. Additional work activities include drainage improvements including reestablishing ditches and replacing failing, damaged, and/or undersized culverts, installation of new guardrail and signs, installation of a retaining wall alongside the road embankment on the south side of the slough, utility relocations, vegetation clearing, and right-of-way (ROW) acquisition. Portions of the existing Manley Hot Springs Slough Bridge #0272 are within the base floodplain of Manley Slough in the form of two piers.

The Tofty Quarry (MS 680-119-2) has been identified as a material source for the project.

We are currently working on the design, engineering, and environmental studies, as well as soliciting public comments. Construction is currently expected in the 2028 summer season.

DOT&PF requests information and comments on resources in the project area that may be affected including historic properties, archaeological sites, wetlands, and floodplain encroachment. The following Executive Orders (EO) apply:

EO 11990, Protection of Wetlands
EO 11593, Protection and Enhancement of the Cultural Environment
EO 11988, Floodplain Management
EO 13112, Invasive Species, as amended by EO 13751

Please submit comments by October 2, 2026, to:

Brandon Irvine, P.E., Engineering Manager
2301 Peger Road, Fairbanks AK 99709-5316
Telephone: (907) 451-5388
Text Telephone (TTY): 711 or 1-800-770-8973
Email: brandon.irvine@alaska.gov

It is the policy of DOT&PF that no one shall be subject to discrimination on the basis of race, color, national origin, sex, age, or disability, regardless of the funding source, including Federal Transit Administration, Federal Aviation Administration, Federal Highway Administration, Federal Motor Carrier Safety Administration and State of Alaska funds. Title VI Nondiscrimination Policy: dot.alaska.gov/tvi_statement.shtml. To file a complaint, visit dot.alaska.gov/cvlrts/titlevi.shtml.

Attachments, History, Details

Revision History

Created 9/1/2026 12:03:56 PM by emiller-chapman

Details

Department: Transportation and Public Facilities
Category: Public Notices
Sub-Category:
Location(s): Northern Region
Project/Regulation #: Manley Hot Springs Slough Bridge #0272 Replacement
 
Publish Date: 9/1/2026
Archive Date: 10/3/2026
 
Events/Deadlines: