Notice of Analysis and Proposed Decision, ROW Lease Amendment - Alpine Diesel Pipeline, ADL 415932 - ACF to Kuukpik Reroute


NOTICE OF ANALYSIS AND PROPOSED DECISION

ALPINE DIESEL PIPELINE, ADL 415932

ALPINE CENTRAL FACILITY TO KUUKPIK PAD REROUTE

 

The Alaska Department of Natural Resources (DNR), pursuant to Alaska Statute (AS) 38.35.080, hereby gives notice that DNR has prepared an Analysis and Proposed Decision for an amendment request submitted by ConocoPhillips Company (CPC) to add additional lands to reroute the Alpine Diesel Pipeline (ADP) from its current termination point at the Alpine Central Facility (ACF) to the Kuukpik Pad.  The proposed reroute crosses over Kuukpik Corporation-owned lands except for the state-owned lands beneath the Colville River’s Nechelik (Nigliq) and Nigliagvik channels.  The project consists of installing new pipeline on existing bridge infrastructure at the channels.  The proposed amendment will allow for a temporary discontinuation of use for the section of ADP pipe along the original route to ACF, which would remain in the ADP ROW Lease. 

The project area is located approximately 61 miles west of Prudhoe Bay, and about 5 miles northwest of Nuiqsut. The ROW addition for the ADP at the Nigliq Channel crossing lies below the ordinary high water line (OHW) within the SWI/4 of Section 13, Township 11 North, Range 4 East, Umiat Meridian (UM); containing approximately four acres for the proposed construction area. The ROW addition for the ADP at the Nigliagvik Channel crossing lies below OHW within the SE1/4 of Section 16, Township 11 North, Range 4 East, UM; containing approximately one acre for the proposed construction; for a total of approximately five (5) acres.

The public is invited to comment on the Analysis and Proposed Decision.  Comments must be submitted in writing to the address below before 5:00 p.m. on November 21, 2025.  If public comment indicates the need for significant changes in the proposed decision, then additional public notice will be given on or after November 21, 2025.  If no significant changes are required, then the proposed decision, including any minor changes, will be issued without further notice as the final decision after November 21, 2025.

 

            Department of Natural Resources

            Division of Oil and Gas – State Pipeline Coordinator’s Section

            550 West 7th Ave, Suite 1100

            Anchorage, AK 99501

            Phone: (907) 269-8800

            Email: SPC.Records@alaska.gov

 

The Analysis and Proposed Decision is available online at: http://dog.dnr.alaska.gov/Newsroom. The public may obtain hard copies of documents at cost, from the address above. 

DNR complies with Title II of the Americans with Disabilities Act of 1990.  Individuals with disabilities who may need auxiliary aids, services, or special modifications to participate in this review may call (907) 269-8411 TTY/TTD.  Please provide sufficient notice for DNR to accommodate your needs.

DNR reserves the right to waive technical defects in this publication.

/s/        Anthony Strupulis, P.E.                                              Publish: October 22, 2025

            State Pipeline Coordinator                                        

            Department of Natural Resources

Attachments, History, Details

Attachments

None

Revision History

Created 10/21/2025 3:12:24 PM by amsimpson

Details

Department: Natural Resources
Category: Public Notices
Sub-Category:
Location(s): Arctic Region, Barrow, Deadhorse, Northern Region
Project/Regulation #:
 
Publish Date: 10/22/2025
Archive Date: 11/22/2025
 
Events/Deadlines: