Tuluksak Power Plant Radiator Repair

This Request for Quotation (RFQ) is for an experienced diesel engine-generator service provider, hereinafter referred to as contractor, to perform Work in the diesel electric power plant in Tuluksak, Alaska. The Work shall consist primarily of removing two failed radiator core assemblies, replacing the cores with new cores, and reinstalling the repaired core assemblies. The Engineer’s Estimate for the Work is between $50,000 and $100,000.


All questions relating to bidding procedures should be directed to:
Rachael Holly, Contract Officer, (907) 771-3055 rholly@akenergyauthority.org 

All questions relating to technical aspects of the project should be directed to:
Dawn Molina, Project Manager, (907) 771-3904 DMolina@akenergyauthority.org or
Brian Gray, Gray Stassel Engineering, (907) 244-8716 brian@gse.engineering


Addendum #01: 
Note that the conditions on site have changed. It was reported on Friday 5/24/24 that the standby generator is not in running condition and is need of immediate repair prior to removing radiator cores. Under Part III Scope of Work, highlighted paragraphs indicate changes to the scope with deleted tasks indicated by strikethrough and new tasks indicated by bold text. All other terms and conditions remain unchanged.

Attachments, History, Details

Revision History

Created 5/23/2024 1:53:39 PM by rmholly
Modified 5/28/2024 4:38:38 PM by rmholly

Details

Department: Commerce, Community, and Economic Development
Category: Procurement
Sub-Category:
Location(s): Statewide
Project/Regulation #: 24137
 
Publish Date: 5/23/2024
Archive Date: 6/4/2024
 
Events/Deadlines: