JNU Egan Drive Improvements - Main Street to 10th Street

Project No.  Z693930000/NH-0932(047); JNU: Egan Drive Improvements- Main to 10th St.

 

STATE OF ALASKA

DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES

SOUTHEAST REGION - DESIGN AND ENGINEERING SERVICES

 

CONSTRUCTION INVITATION TO BIDS (ITB’s)

Sealed bids in single copy for furnishing all labor, materials, and equipment, and performing all work on Project No. Z693930000/NH-0932(047); JNU: Egan Drive Improvements- Main to 10th St., described herein, will be received until 2:00 p.m. prevailing time, October 30, 2018 at the Construction Contracts Office, 1st Floor, 6860 Glacier Highway, Juneau, Alaska.

Construct improvements on Egan Drive Road from Main Street to 10th Street which functions as a major transportation corridor into downtown Juneau, including: Widen the roadway and relocate or adjust medians to accommodate addition of bike lanes and wider sidewalks, reconstruct the structural pavement section, re-grade and resurface intersecting streets to match new Egan Drive configurations, widen Egan seaward by constructing a Mechanically Stabilized Earth (MSE) wall along approximately 1,300 linear feet between West Eighth Street and Whittier Street, repair existing concrete retaining wall under the Merchant’s Wharf building and replace part of timber retaining wall under the Merchant’s Wharf parking area, replace bridge rail and remove transition rail, re-slope the sidewalk to comply with the Americans with Disabilities Act, add a waterproof membrane and resurface the bridge deck, and add new name place signs on Gold Creek Bridge, remove, replace, and extend storm drainage systems , slip line storm drains, realign storm drain and conduit for utilities, relocate/replace electrical conduit and luminaires, valve boxes, manholes, above ground power and telephone utility boxes, Replace and realign the traffic signals within the corridor, Remove two existing pedestrian lookouts, replace signs and install new way finding signs to direct pedestrian and bicycle traffic.

The Engineer's Estimate is between $10,000,000 and $20,000,000. All work shall be completed by September 30, 2020. This project is a Race Neutral DBE Goal project.  See Standard Specification G-120 for details.

The Invitation to Bid, plans, specifications, bidder’s packets and other bidding documents may now be obtained for bidding purposes at no charge by downloading from the following location: Southcoast Region Bid Calendar.   If you download the document, even though there is no charge, you must register with the DOT&PF by sending an E-Mail to: srdotpfcontracts@alaska.gov or your bid may not be accepted.  You must send your Company Name, contact name, mailing address, phone and fax numbers, and whether you are registering as a General, Subcontractor, or Supplier.  You may not change or alter the downloaded Bidding Forms in any way.  You must still submit these Bidding Forms by the normal Sealed Bid Procedure using the issued DOT&PF forms given and by the deadline.  Electronic bids will not be accepted.

Fax addenda and Bid Modification sheets will continue to be faxable to us as in the past.  We will also continue our process to fax addenda to all those registered Planholders.  Electronic copies of these documents are also available at the website listed above.

Attachments, History, Details

Attachments

None

Revision History

Created 10/5/2018 2:17:53 PM by ksbartness

Details

Department: Transportation and Public Facilities
Category: Procurement
Sub-Category: Construction Bids
Location(s): Juneau
Project/Regulation #: NH-0932(047) / Z693930000
 
Publish Date: 10/5/2018
Archive Date: 10/31/2018
 
Events/Deadlines: