Sealed bids for furnishing all labor,materials, equipment and performing all work on Project No. 0A12(004)/63567, Tok Cutoff MP 75.6 Slana River Bridge #0654, described herein, will be received until 2:00 p.m. prevailing time, November 3, 2015, in the Office of the Contracts Engineer, Engineering Services Building, Room 3, 2301 Peger Road, Fairbanks, Alaska.
This project will replace the existing Slana River Bridge located at MP 75.6 of the Tok Cutoff. Profile grades will be raised to accommodate the new bridge structure, 0.5 miles of roadway and one existing pullout will be paved.S igns, culverts and guardrail will be replaced.
Engineer's Estimate is greater than $5,000,000.
The project completion date is October 31, 2017.
Plans, specs, bid documents, reports, addenda and other bidder information are posted online, available for downloading free of charge at: http://www.dot.state.ak.us/apps/contracts?ACTION=bidcal#43877.
Hard copies of plans & specifications are still available from the Contracts Section, Department of Transportation & Public Facilities, Engineering Services Building, Room 3, 2301 Peger Road, Fairbanks, Alaska 99709, telephone number (907) 451-2247; TDD (907) 451-2363 (for Hearing Impaired, requires special equipment). There is a non-refundable charge of $100, per set. Check or money order must be madepayable to: State of Alaska.
Bidding documents are available for inspection at the DOT&PF regional office in Fairbanks.